Tuesday, March 5, 2024

[17/01/2024] & [21/01/2024]

  WEDNESDAY, 17/01/2024 

Everything are quite ready, the cameras are good, lens are also OK. The only thing here is the costumes, makeup and more. Need to save money for that.

 DAY 1 : SUNDAY 21/01/2024 - DANCER'S PHOTOSHOOT
I was really excited and nervous at the same since this is the first time I'm doing this gig. Camera, lens, lights, available makeup and costumes are ready. However, it can't be done since the security guy didn't let me and the dancers in, due to the lack of information from the school B.O.D, although I have sent an email of permission to come to the school in the weekend for my production. This have create an obstacle in my timeline, luckily, I got a backup day, which is the 30th of January so we're good with it. 


( In the elevator on the way to my friend's home to take the lights )


( on my way to her home )


notes : 

AN OVERVIEW OF OUR FILMING GEARS 

We use different cameras and lens for the production process, in which helps us captured different shots and angles, lights as well. There are some parts that we also use the stage lights and tripods from school, not to mentioned some provided light boxes, therefore the process went smoother. 

For Filming : (from left to right)

Artisan Prime Lens 50mm f1.2 

Sony A6000 Stock 18-55mm Zoom Lens

.

Moza Aircross 2 Gimbal

 .

SmallRig lightboxes




For Photoshooting : ( from left to right ) 

Canon EOS Rebel 16 
.
Canon EOS Rebel 16 EFS 18-55mm Lens
.
SmallRig lightboxes


( some of the gears were using back and forth for different purposes, this is just our first intention for what gears we gonna use for particular process, however, we end up changing and being flexible with gears for experimenting different shots, quality and light captured )

No comments:

Post a Comment

FINAL PRODUCT

1. THE MUSIC VIDEO :  2. THE DIGIPAK :  The Digipak Version 1 The Digipak Version 2 3. THE SOCIAL MEDIA PAGE :